Ashokan release increased to 200 MGD

The Ashokan Release Channel will be increased from 15 to approximately 200 MGD. The increase will be executed incrementally in 20 to 40 MGD steps from 1PM to 7PM.

The current release channel turbidity is 5.50 ntu. The Ashokan Reservoir East Basin spillway is currently flowing at approximately 778 MDG.